  Please cite page as: Africa Groundwater Atlas. 2019. Case study: Capacity building in the manual drilling sector in Chad. British Geological Survey. Accessed [date you accessed the information]. ''Weblink''.


This page is being developed. Please check back soon for updates.  
  This page is being developed. Please check back soon for updates.  





Revision as of 11:04, 2 July 2019

Africa Groundwater Atlas >> Additional resources >> Case studies >> Case study: Capacity building in the manual drilling sector in Chad

 Please cite page as: Africa Groundwater Atlas. 2019. Case study: Capacity building in the manual drilling sector in Chad. British Geological Survey. Accessed [date you accessed the information]. Weblink.
  This page is being developed. Please check back soon for updates. 


Go to the Hydrogeology of Chad page.


Capacity building in the manual drilling sector in Chad

How can manual drilling help improve water supplies?

Manual drilling is only appropriate in certain hydrogeological situations – e.g., where the rocks or sediments are easy to drill through and the water table is shallow. But in these areas, experienced, well equipped manual drillers can deliver boreholes much more cheaply and to the same standards as mechanical drilling, and often in areas that are hard to access by mechanical drilling rigs – so it is quicker and cheaper to increase people’s access to improved water supplies.

Water access and manual drilling in Chad

Access to improved water sources in Chad is poor – only 45% of the rural and 72% of the urban population. There have been manual drilling programmes in Chad since the 1960s, but most of the boreholes drilled failed after a few months, often because of unsuitable design and materials. This has led to negative perceptions of manual drilling in general.

However, today there are still many small and experienced private manual drilling enterprises in Chad, who in many areas produce good quality boreholes, but still encounter a number of problems. When this was recognised, the Government of Chad and a number of NGOs (including UNICEF and the PRACTICA Foundation) developed a strategy to support and build on the existing manual drilling sector, improving capacity and expanding the benefits of manual drilling more widely across the country.


A manual drilling operation in Chad, using the sludging method. Image credit: PRACTICA Foundation 2009

Feasibility project by UNICEF and partners

In order to demonstrate the commercial viability of this approach, a feasibility project was started in 2006 to install 1000 new manually drilled water points to a suitable quality. The project was undertaken by UNICEF Chad with partners including the PRACTICA Foundation and the Government of Chad.

Choosing the right area for manual drilling

Initial work showed that the geology of large parts of central Chad appeared to be appropriate for manual drilling – rocks that are relatively easy to drill through, and a shallow water table. This is also the area where populations are rising fastest, and therefore where demand for new water supplies is growing.

Map showing favourable zones for manual drilling in central Chad. Image credit: UNICEF et al. 2009

Identifying and tackling problems with existing manual drilling techniques

The project identified the main problems encountered with boreholes installed by the existing manual drilling sector as:

- water quality
- not high enough discharge (pumping) rates
- failure of installed pumps

In response, the following actions were proposed to increase the professionalism and effectiveness of the manual drilling sector:

- developing Government-approved technical standards for the design of and procedures for manual borehole drilling, installation and development. This was done in collaboration with the Directorate of Hydraulic Affairs. Draft standards were checked with drilling enterprises and Quality Controllers, and the final standards accepted by the Chadian government.
- establishing a Government-approved training programme and a quality monitoring system, and a system of certification of trained professional enterprises.

Training programme

An intensive training programme for manual drillers was developed. A total of 43 existing manual drilling enterprises in Chad were selected to undergo training.

Selection and training of 20 Quality Controllers was also done – largely staff of the Directorate of Hydraulic Affairs / Water Directorate. They received five days intensive coaching in the skills needed to assess and certify manually drilled boreholes.

Training activities included a five day basic hydrogeological training course for the manual drillers, followed by a coached practical assignment to drill three community boreholes. These boreholes were assessed by the newly trained Quality Controllers. All the drillers then also received two days business management training from the Centre de Développment des Enterprises (CDE). Following the initial training, extra and/or refresher training was also offered as needed, including practical coached drilling sessions and further business management coaching.

The final part of the training involved testing the drillers in their ability to drill and construct suitable quality boreholes and interact with community and social mobilizers. If successful, the drilling enterprises were awarded a Government-approved certification.

Further capacity development initiatives

Having well-qualified drilling enterprises, standards and quality monitoring systems is not enough. The following aspects are also essential:

- Under this improved programme, the manual drilling companies are responsible for installing pumps and head works for the boreholes they drill. However, in line with the Government policy of empowering water users, this programme has promoted pump maintenance through the development of Water Point Management Committees and an associated network of pump repair operators and spare parts marketing network, in collaboration with the Directorate of Hydraulic Affairs.
- Centralised collection of borehole data is encouraged. Borehole data collected during manual drilling is passed to a central database held by the Water Directorate. This data is essential to improve mapping and understanding of hydrogeological conditions in Chad, and also provides information in case there are problems with a specific water point.
- A national manual drilling association was established in 2009 - Association Tchadienne pour la promotion des entreprises spécialisées en forage à faible cout (ATPESFORC). This association aims to continue to improve the capacity of small and medium sized manual drilling enterprises, by providing information relating to aspects like: purchasing materials; low cost drilling; business skills; and marketing opportunities.
- A more considered strategy was promoted for the selection of sites for new water points, prioritising schools and health care centres.

Project summary

The development and implementation of a strategy to build capacity in the manual drilling sector takes time, flexibility and perseverance. Despite difficulties, the project described here has made substantial achievements. From 2006 to 2008, 13 of the 43 initially selected manual drilling enterprises went through the training programme; a group of 20 Quality Controllers were trained; and the Chadian Government officially endorsed the newly developed Technical Well Standards.

The future

The outlook for manual drilling in Chad is promising, with improvements seen in capacity and professionalisation of the sector. However, the capacity building programme described here cannot solve all the problems involved in developing sustainable water points – particularly in areas that are unsuitable for manual drilling. The ongoing development of new hydrogeological understanding arising from basic groundwater data collection and management can help by refining knowledge of where manual drilling techniques are appropriate, so that they can be targeted where they will be most successful.

One area where manual drilling could have potential is in more remote areas such as the islands of Lake Chad. The sandy geological deposits there are suitable for manual drilling, and the transportation of heavy drilling machinery is harder, meaning that there is much scope for smaller manual drilling equipment. Professional maintenance in such remote areas is also more difficult, due to transport and capacity constraints, so there may be potential for supported community based management. There are also specific issues in this area that must be addressed: for example, high salinity groundwater, which can cause corrosion of borehole materials, may be a problem in this area.

Sources

This case study is based on the following report:

PRACTICA Foundation, UNICEF and EnterpriseWorks/VITA. 2009. The impact of manual drilling for the construction of sustainable water-points in Chad.


For more on manual drilling in Chad and more widely in Africa, see also:


PRACTICA Foundation, EnterpriseWorks/VITA and UNICEF. undated. Republic of Chad: Feasibility study for manual drilling: mapping of favourable zones.

Danert, K. 2014. Chad’s Growing Manual Drilling Industry. Skat Foundation, Switzerland.

UNICEF, EnterpriseWorks/VITA and Practica Foundation. 2010. Professionalizing the Manual Drilling Sector in Africa: a guide to building capacity to increase access to safe water in rural areas. UNICEF, New York.