Difference between revisions of "Case Study Drilling South Sudan"
Jump to navigation
Jump to search
KirstyUpton (talk | contribs) |
KirstyUpton (talk | contribs) |
||
Line 8: | Line 8: | ||
===Introduction=== | ===Introduction=== | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
===Hydrogeology=== | ===Hydrogeology=== | ||
+ | |||
===Procurement=== | ===Procurement=== | ||
− | + | ||
− | |||
− | |||
===Siting, design and construction=== | ===Siting, design and construction=== | ||
− | + | ||
− | |||
− | |||
− | |||
− | |||
===Data collection=== | ===Data collection=== | ||
+ | |||
===Lessons learnt=== | ===Lessons learnt=== | ||
− | + | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
===Sources=== | ===Sources=== |
Revision as of 16:53, 20 July 2018
Africa Groundwater Atlas >> Additional resources >> Case studies >> Drilling South Sudan
Go to the Hydrogeology of South Sudan page.
Contents
Drilling an unsuccessful borehole: lessons learnt from South Sudan
Introduction
Hydrogeology
Procurement
Siting, design and construction
Data collection
Lessons learnt
Sources
Return to Africa Groundwater Atlas >> Additional resources >> Case studies