Difference between revisions of "Case Study Drilling South Sudan"
Jump to navigation
Jump to search
[checked revision] | [checked revision] |
KirstyUpton (talk | contribs) |
|||
Line 1: | Line 1: | ||
[[Africa Groundwater Atlas Home | Africa Groundwater Atlas]] >> [[Additional resources | Additional resources]] >> [[Case studies | Case studies]] >> Drilling South Sudan | [[Africa Groundwater Atlas Home | Africa Groundwater Atlas]] >> [[Additional resources | Additional resources]] >> [[Case studies | Case studies]] >> Drilling South Sudan | ||
+ | |||
+ | This page is being developed - please check back soon for more content | ||
Revision as of 17:26, 3 April 2019
Africa Groundwater Atlas >> Additional resources >> Case studies >> Drilling South Sudan
This page is being developed - please check back soon for more content
Go to the Hydrogeology of South Sudan page.
Contents
Drilling an unsuccessful borehole: lessons learnt from South Sudan
Introduction
Hydrogeology
Procurement
Siting, design and construction
Data collection
Lessons learnt
Sources
Return to Africa Groundwater Atlas >> Additional resources >> Case studies