Editing OR/13/001 Model development log
Jump to navigation
Jump to search
Your changes will be displayed to readers once an authorised user accepts them. (help) |
Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
This page supports semantic in-text annotations (e.g. "[[Is specified as::World Heritage Site]]") to build structured and queryable content provided by Semantic MediaWiki. For a comprehensive description on how to use annotations or the #ask parser function, please have a look at the getting started, in-text annotation, or inline queries help pages.
Latest revision | Your text | ||
Line 8: | Line 8: | ||
'''8 January 2013'''<br> | '''8 January 2013'''<br> | ||
− | + | Added a BGS bald earth model at 50 m resolution trimmed back to model area<br> | |
− | + | Tidied the gsg1 lense at Marks Tey and produced envelope for the top this now works<br> | |
− | + | Model is not totally snapped<br> | |
− | + | Project saved as Southern merge_16 with faults and baselines and Southern merge_17 with the single fault stripped out and baselines converted to polygons<br> | |
− | + | Calculation takes about 40 minutes<br> | |
− | + | Mgr, wgr and wmgr have envelopes and are shown in sections<br> | |
− | + | Several screen grabs made for this report all at VE x10<br> | |
− | + | Added 2 llte helpers due to an upward bulge at Marks Tey | |
'''30–31 January 2013'''<br> | '''30–31 January 2013'''<br> |