OR/15/038 Foreword: Difference between revisions
Jump to navigation
Jump to search
Geosource>Ajhil No edit summary |
m 1 revision imported |
||
(No difference)
| |||
Latest revision as of 11:34, 26 July 2021
| Gareth Farr (with contributions from Luz Ramos Cabrera). 2015. Nedern Brook Wetland SSSI Phase 1 hydrological monitoring. British Geological Survey Internal Report, OR/15/038. |
This report contains a description of a hydrological study undertaken by the British Geological Survey (BGS) for Natural Resources Wales at the Nedern Brook Wetland SSSI, South Wales. The primary objective was to characterise one flood cycle at the Nedern Brook Wetland SSSI and answer selected recommendations made by Haskoning UK Ltd (2013)[1].
References
- ↑ HASKONING UK LTD. 2013. Nedern Brook River Restoration Option Summary Report. Final Draft Report for Environment Agency Wales. Reference 9Y0437/R/303693/Soli.