OR/17/049 Intro page: Difference between revisions
Jump to navigation
Jump to search
m 1 revision imported |
No edit summary |
||
| Line 48: | Line 48: | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| Technical Review – Signature | | Technical Review – Signature | ||
| [[Image: | | [[Image:OR17049signature1.jpg|frameless|left|75px| ]] | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| Date | | Date | ||
| Line 57: | Line 57: | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| Final BGS SD Approval – Digital Signature | | Final BGS SD Approval – Digital Signature | ||
| [[Image: | | [[Image:OR17049signature2.jpg|frameless|left|75px| ]] | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| Date | | Date | ||
Revision as of 11:42, 5 March 2018
| Ward, R S1, Smedley, P L1, Allen, G2, Baptie, B J1, Daraktchieva, Z3, Horleston, A7, Jones, D G1, Jordan, C J1, Lewis, A4, Lowry, D5, Purvis, R M4, and Rivett, M O6. 2014. Environmental baseline monitoring project: phase II - final report. British Geological Survey Internal Report, OR/17/049.
(1) British Geological Survey, (2) University of Manchester, (3) Public Health England, (4) University of York (National Centres for Atmospheric Science), (5) Royal Holloway University of London, (6) University of Birmingham, (7) University of Bristol |
Environmental baseline monitoring project: phase II – final report |
Document preparation and approval | |
| Prepared by: | Ward, R S1, Smedley, P L1, Allen, G2, Baptie, B J1, Daraktchieva, Z3, Horleston, A7, Jones, D G1, Jordan, C J1, Lewis, A4, Lowry, D5, Purvis, R M4 and Rivett, M O6 |
| Approved by: | R S Ward |
Document information | |
| Document Type | Open Report |
| Document Number: | BGS OR/17/049 |
| Revision: | V 3 |
| Date: | 31.08.2017 |
| Contract Number: | NEE5934 |
| Awarding body: | DBEIS |
| Document Location | NERC/NORA (to be updated) |
| Technical Review – Name | Pauline Smedley |
| Technical Review – Signature | |
| Date | 15.08.2017 |
| Final BGS SD Approval – Name | Rob Ward |
| Final BGS SD Approval – Digital Signature | |
| Date | 15.08.2017 |
Version history | ||
| V 0.1 | Individual Contributions | 17.03.2017 |
| V 0.2 | Quality Check | 17.03.2017 |
| V 1.0 | Technical Review | 15.08.2017 |
| V 2.0 | Compiled Report | 15.08.2017 |
| V 3.0 | Director Review | 15.08.2017 |
| V 3.0 | Client Release | 24.08.2017 |
| V 4.0 | Publication | 31.08.2017 |