OR/14/048 Appendix 1: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 3: | Line 3: | ||
The following pages contain information about, and data from the 40 day long batch experiments. | The following pages contain information about, and data from the 40 day long batch experiments. | ||
[[Image:14048appendparta.jpg|thumb|center| | [[Image:14048appendparta.jpg|thumb|center|800px|Part A: Experiments run at 20°C and 80 bar. ]] | ||
[[Image:14048appendpartb.jpg|thumb|center| | [[Image:14048appendpartb.jpg|thumb|center|800px|Part B: Experiments run at 40°C and 40 bar. ]] | ||
[[Image:14048appendpartc.jpg|thumb|center| | [[Image:14048appendpartc.jpg|thumb|center|800px|Part C: Experiments run at 40°C and 80 bar. ]] | ||
[[Category: OR/14/048 Results of laboratory carbonation experiments on Nirex Reference Vault Backfill cement | 14]] | [[Category: OR/14/048 Results of laboratory carbonation experiments on Nirex Reference Vault Backfill cement | 14]] |
Latest revision as of 10:14, 5 February 2016
Rochelle, C A, Purser, G, and Milodowski, A E. 2014. Results of laboratory carbonation experiments on NRVB cement. British Geological Survey Internal Report, OR/14/048. |
The following pages contain information about, and data from the 40 day long batch experiments.


