OR/17/049 Intro page
| Ward, R S1, Smedley, P L1, Allen, G2, Baptie, B J1, Daraktchieva, Z3, Horleston, A7, Jones, D G1, Jordan, C J1, Lewis, A4, Lowry, D5, Purvis, R M4, and Rivett, M O6. 2014. Environmental baseline monitoring project: phase II - final report. British Geological Survey Internal Report, OR/17/049.
(1) British Geological Survey, (2) University of Manchester, (3) Public Health England, (4) University of York (National Centres for Atmospheric Science), (5) Royal Holloway University of London, (6) University of Birmingham, (7) University of Bristol |
Environmental baseline monitoring project: phase II – final report |
Document preparation and approval | |
| Prepared by: | Ward, R S1, Smedley, P L1, Allen, G2, Baptie, B J1, Daraktchieva, Z3, Horleston, A7, Jones, D G1, Jordan, C J1, Lewis, A4, Lowry, D5, Purvis, R M4 and Rivett, M O6 |
| Approved by: | R S Ward |
Document information | |
| Document Type | Open Report |
| Document Number: | BGS OR/17/049 |
| Revision: | V 3 |
| Date: | 31.08.2017 |
| Contract Number: | NEE5934 |
| Awarding body: | DBEIS |
| Document Location | NERC/NORA (to be updated) |
| Technical Review – Name | Pauline Smedley |
| Technical Review – Signature | |
| Date | 15.08.2017 |
| Final BGS SD Approval – Name | Rob Ward |
| Final BGS SD Approval – Digital Signature | |
| Date | 15.08.2017 |
Version history | ||
| V 0.1 | Individual Contributions | 17.03.2017 |
| V 0.2 | Quality Check | 17.03.2017 |
| V 1.0 | Technical Review | 15.08.2017 |
| V 2.0 | Compiled Report | 15.08.2017 |
| V 3.0 | Director Review | 15.08.2017 |
| V 3.0 | Client Release | 24.08.2017 |
| V 4.0 | Publication | 31.08.2017 |